We had the new driveway poured this week for the carriage house. This means we are so close to being done. It looks great--still need to do the bricks at the very end by the street, but it's dry enough for us to walk on. We have to wait until next week to drive on it, but that'll be here before we know it. First, here's a shot of the carriage house from the main house's front door.
Next is a little closer so you can see the curve in the path.
This is right in front of the carriage house. Exterior is all done (I think).
This is the main floor. I didn't take any pictures of the garage, as it is a bit of a mess with a lot of saws and other tools lying around. This main room just requires some touch-up paint and minor trim pieces.
The bathroom looks great. The shower is probably nicer than what we have in our house. Everything is done in the bathroom except some trim pieces on the floor.
Here is another shot of the main room from the other side.
We should be done right after Thanksgiving...which means we need to start furnishing the place :-)
Bode is doing great in school. He got all A's and B's on the first quarter report card, and we continue to be thankful that Meigs has been able to stay open since 31 August. Bode had to do a science project last week--a 3-D model of a plant cell.
He molded all the parts himself out of clay. Ashley helped with the main body, and I helped him type up the definitions, but this project (compared to some others) was mostly Bode's work. He earned a solid A and a treat from Sonic.
Only a few more work days until a much needed break for all of us. We are looking forward to some water-skiing and a lot of turkey! Pleasant day to all.