We now have power, water, garage doors, kitchen cabinets, and counter-tops in the carriage. We need the HVAC to be installed, which can happen now because we were waiting on power. After that, the upstairs floor can go in, and then we are very close. There will need to be some touch up things done, but we will be very close to the point where we can start using it.
Here is a movie of the garage doors going down.
Here is a shot of the front of the carriage house with the garage doors closed. The exterior lights need to be mounted, which will go where those white wires are hanging.Next is a shot of the interior of the garage. Note the overhead lights are all working.
Upstairs is looking good. Here are the cabinets and the counter-top for the kitchen.Next is a shot of the upstairs. The gap in the cabinets is where the fridge will go. The fans and lights all work, and it looks very nice.Here are a couple shots of the bathroom; still need to install the toilet, and there will be some lights over the sink.Finally, here is a shot of Ashley's work room.
Maybe a few more weeks and it'll be ready for us to start parking in :-) Auburn football returned today with a 29 - 13 victory over Kentucky. We are all excited to have SEC football back!
No comments:
Post a Comment