Saturday, September 12, 2020

Carriage House

 We see the glimmer of the light at the end of the tunnel for the carriage house.  Water and sewer were connected this week, and we are waiting on the power company to connect power.  All the major painting has been done, but there will be some touch-up work done after everything is complete.  Once we get power, the AC can be installed.  Once we have AC, the floor can go in.  There are some other minor items like the setting of the toilet, the shower door, and plumbing all the fixtures.  Plus, we still need garage doors, but hopefully that happens this week.  It feels real close though, and we are excited.

It's hard to tell from this first image, but all the exterior painting is done.  The doors have also been painted.  The tractor is still here because there was a significant amount of digging to find the hook ups for the water and sewer.

Next is a shot of the house from the front.

This is the interior of the garage; there is a lot of trash, but note the outlets are wired and the fuse box is in.
The kitchen cabinets are installed and the sink is in place.  The counter tops have been templated and should be installed in a week.
The fridge will go in that gap on the right; it's currently sitting in the middle of the room, and they won't put it in place until everything else is done.  The bathroom tile looks great on the floor and in the shower.
Finally, here's a view of the whole upstairs.
The big pile of boxes on the floor on the right is the floor, so it's ready to be installed once AC goes live.  Here's hoping this happens this week.

No comments: